Paving schedule set in Coal Twp.
COAL TOWNSHIP - Paving is scheduled as follows for this week in connection with the sewer system work in the township.
Monday: Sheridan Street and Tioga to Wabash Street and Pulaski Avenue from Logan to Sheridan Street.
T
↧